Dynomite Diesel Ford 99-03 7.3L Individual Stock #8 LONG LEAD Injector Dynomite Diesel DDP.AENEW
Fuel Injector
DDP.AENEW
CALIFORNIA WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
Pricing:
$285.00
Description
Ford 99-03 7.3L Powerstroke Injector: Brand New (not reman) long lead injector intended for cylinder #8 on some 99-03 7.3L engines. Stock power level injector. Sold individually with all the latest revisions.
Note: This particular injector is solely intended for the #8 cylinder on some engines which came equipped with what's known as a long lead injector installed in that cylinder. If you are unsure what your engine came equipped with or do not want to take the time to check then order DDP ADNEW for the #8 cylinder and the other seven cylinders if needed.
Details:
- Liter: 7.3
- Engine: Powerstroke
- Years: 1999-2003
- Fuel Type: Diesel
- Condition: New
- Not For Sale In California
Details
Shipping Information
- Item Requires Shipping
- 4.0 lbs.
- W3.5000” x H3.5000” x L10.5000”
- Free ground shipping for all orders over $150 lower 48 states
Customer Reviews
Total Reviews (0)
You must login to post a review.
Write the First Review!